Ford Sharonville 700,000-square-foot transmission plant
At a glance
Company:
Industry:
Service:
ÂÜÀòÉç Group Site Management associates from the Toledo and Lima offices performed concrete and utility work in Ford’s 60-year-old transmission plant.
ÂÜÀòÉç Inc. managed concrete demo, removal and placement sub-base for approximately 700,000-square-feet of existing slab.
ÂÜÀòÉç Inc. managed underground piping and electrical grounding. Demolished concrete is being crushed for reuse onsite. ÂÜÀòÉç Inc. and ÂÜÀòÉç are coordinating closely to ensure schedule milestones are met in numerous work areas.
The ÂÜÀòÉç Group crews worked in an operating facility where dust and vibration control had to be continuously maintained. The project met with safety and reliability success due to the number of ÂÜÀòÉç Group resources, equipment and manpower, working in an operating facility, with zero safety incidents and no downtime.